EN

Logistics centre development

In 2020, the infrastructure of the logistics center was renewed and developed: ramps, gates, lighting system and storage racks, as well as warehouse equipment used for (un)loading goods, storage and order collection.

A modern building management system has been implemented, which allows efficient use of energy resources for lighting, heating and ventilation of premises – thus contributing to the reduction of CO2 emissions.

A special storage area was equipped, which has a temperature-controlled regime and the ability to maintain the required temperature when storing temperature-sensitive products.

Back to article list